HomeGTA NewsIs the Eglinton Crosstown Open? Line 5 Status, Stations and Fares

Is the Eglinton Crosstown Open? Line 5 Status, Stations and Fares

Yes, Line 5 Eglinton opened February 8, 2026. Here are the 25 stations from Mount Dennis to Kennedy, fares, connections,
eglinton-crosstown-line-5-opening
Quick answer

Yes. The Eglinton Crosstown, now TTC Line 5 Eglinton, opened to riders on February 8, 2026. It runs 19 kilometres from Mount Dennis to Kennedy with 25 stations and stops, and costs a regular TTC fare of $3.30 with PRESTO or a card tap. Line 6 Finch West opened earlier, on December 7, 2025.

Is the Eglinton Crosstown Line 5 open? Yes, since February 2026

After more than a decade of construction, delays and boarded-up storefronts along Eglinton Avenue, the Eglinton Crosstown LRT finally carried its first paying passengers on February 8, 2026. It operates as TTC Line 5 Eglinton. Metrolinx built the line and owns it, while the TTC runs the trains and staffs the stations.

So if you have been waiting to ride it, you can. As of October 2026, Line 5 has been in regular service for more than eight months, with longer hours and some speed improvements added since opening day.

The route: Mount Dennis to Kennedy

Line 5 runs about 19 kilometres east-west across midtown, from Mount Dennis station near Weston Road and Eglinton in the west to Kennedy station in Scarborough in the east. It has 25 stations and stops. The central section, roughly from Keelesdale to Laird, runs underground with subway-style stations, while much of the eastern section runs on the surface in the middle of Eglinton Avenue, with platforms at intersections.

From west to east, the stations and stops are:

  1. Mount Dennis
  2. Keelesdale
  3. Caledonia
  4. Fairbank
  5. Oakwood
  6. Cedarvale
  7. Forest Hill
  8. Chaplin
  9. Avenue
  10. Eglinton
  11. Mount Pleasant
  12. Leaside
  13. Laird
  14. Sunnybrook Park
  15. Science Centre
  16. Aga Khan Park and Museum
  17. Wynford
  18. Sloane
  19. O’Connor
  20. Pharmacy
  21. Hakimi Lebovic
  22. Golden Mile
  23. Birchmount
  24. Ionview
  25. Kennedy

Note that the former Eglinton West subway station on Line 1 is now called Cedarvale, reflecting its role as a Line 1 and Line 5 interchange.

Connections to the subway, GO and UP Express

Line 5 links several of the region’s busiest transit lines, which is a big part of its value:

StationConnects to
Mount DennisGO Transit Kitchener line and UP Express to Pearson Airport
CedarvaleLine 1 Yonge-University (Spadina branch)
EglintonLine 1 Yonge-University (Yonge branch)
KennedyLine 2 Bloor-Danforth and GO Transit Stouffville line
CaledoniaFuture connection to the GO Barrie line
Science CentreFuture connection to the Ontario Line

For someone in Golden Mile or Kennedy Park heading to Yonge and Eglinton, the line removes the old slog on the 34 bus through traffic. For riders from Weston or Mount Dennis, it creates a direct link to Midtown and to the UP Express for the airport.

Fares and how to pay

Line 5 is part of the TTC network, so it costs the same as the subway or a bus: $3.30 for an adult with PRESTO or a debit or credit card tap, or $3.35 in cash. The TTC’s two-hour transfer applies, so you can ride Line 5, switch to Line 1 or Line 2 and finish on a bus without paying again within that window.

Since August 31, 2026, the TTC has replaced most monthly passes with fare capping: after 47 paid fares on the same card or phone in a calendar month, the rest of your rides that month are free.

How you pay depends on the station. The underground stations have fare gates like the subway. At the surface stops in the east end, fare is collected on a proof-of-payment basis, so you tap at the platform validator before boarding and fare inspectors may ask to see proof. Children 12 and under ride free.

What changed for riders since opening

The line opened in phases of improvement rather than all at once. Here is what has changed since February:

  • Speed: At launch, trains were limited to 60 km/h in the tunnel and a full end-to-end trip took roughly 50 to 55 minutes, compared with about 105 minutes on the bus it largely replaced.
  • Signal priority: In mid-March 2026, the city adjusted traffic signals at nine intersections between Kennedy and Don Valley so trains get priority over left-turning cars. Priority at Leslie Street was deferred for more testing.
  • Longer hours: Service initially ended around 11 p.m., with buses covering late evenings. Since April 5, 2026, trains run until about 1:20 a.m., ending the late-night replacement buses.
  • Frequency: Trains run about every four minutes at peak times and every six to 10 minutes off-peak.

Metrolinx and the TTC have said further work is aimed at adding trains, improving trip-time reliability and completing signal priority on the surface section. Before opening, the TTC had also raised concerns about unexpected emergency-brake activations in testing; Metrolinx judged them not serious enough to delay the launch.

What about the western extension to Renforth?

The Eglinton Crosstown West Extension is under construction. It will extend the line west from Mount Dennis to Renforth Drive at the Mississauga border, closer to Pearson Airport, with seven more stations planned. No firm opening date has been confirmed by the province or the City of Toronto, so treat any date you see as an estimate until it is officially announced.

And Line 6 Finch West?

Line 6 Finch West opened on December 7, 2025, two months before Line 5. It runs about 10.3 kilometres along Finch Avenue West, with 18 stops between Humber College in Etobicoke and Finch West station on Line 1 at Keele Street. Riders can connect to the 35 Jane bus at Jane and Finch and, at Humber College, to TTC, MiWay, Brampton Transit and York Region Transit buses.

Its first winter was rough. A power issue suspended service for about three hours on January 12, 2026, and a major snowstorm closed the line for about a day and a half starting January 15. Track switch heaters struggled in ice and snow, and buses replaced trains over the Victoria Day weekend while crews did winterizing work. On the plus side, late-evening train service between 10 p.m. and 1 a.m. began March 15, and by May Metrolinx reported on-time performance up 25 per cent and round trips 16 minutes shorter than at opening.

The bottom line

Yes, the Eglinton Crosstown is finally open. Line 5 Eglinton has carried TTC riders since February 8, 2026, across 25 stations and stops from Mount Dennis to Kennedy, for the regular $3.30 fare, with connections to Lines 1 and 2, the GO Kitchener and Stouffville lines and the UP Express. Line 6 Finch West has been running since December 7, 2025. Both lines have improved since launch, but check the TTC’s service alerts before you travel, especially in winter weather.

Frequently asked questions

When did the Eglinton Crosstown open?

The Eglinton Crosstown opened to passengers as TTC Line 5 Eglinton on February 8, 2026, running from Mount Dennis to Kennedy.

How much does it cost to ride Line 5 Eglinton?

Line 5 uses regular TTC fares: $3.30 for adults with PRESTO or a debit or credit tap, $3.35 cash, with a free two-hour transfer to other TTC routes.

Does the Eglinton Crosstown go to Pearson Airport?

Not directly. You can transfer to the UP Express at Mount Dennis to reach Pearson. The West Extension toward Renforth Drive, closer to the airport, is under construction with no confirmed opening date.

You may also search for:Mortgage Calculator Guide for CanadaGTA Real Estate Market UpdateUnderstanding APR in CanadaFree Financial Tools for Canadians

Information current as of October 2026. Rates, fares and rules change: check official sources (ontario.ca, toronto.ca, ttc.ca) before making decisions.

Comments are off for this post.