
The light rail line linking Mississauga and Brampton is one step closer to reaching downtown Brampton. The Ontario government announced on November 12, 2026 that crews have started early work on the Hazel McCallion Line extension into downtown Brampton.
Crews are drilling boreholes along Main Street. This geotechnical work tells engineers what the ground is made of. Metrolinx says the soil findings will help decide what equipment is used to build the extension.
No construction schedule, opening date or cost has been announced for the extension so far.
The main Hazel McCallion Line runs 18 kilometres between Brampton and Mississauga, with 19 stops on a dedicated light rail corridor along Hurontario Street. Light rail vehicles are currently being tested along the corridor. A separate extension into downtown Mississauga is being planned as its own project.
Right now, the line is planned to stop at the Brampton Gateway Terminal, at the city’s southern edge. Bringing it into downtown Brampton would link it directly to the GO station, so riders could switch between light rail, local buses and GO trains in one place. For people commuting between Peel Region and Toronto, that connection matters as much as the new track itself.
Expect some disruption on transit near the corridor in the meantime: overnight Hurontario LRT work has recently affected several GO and MiWay bus routes at Mississauga City Centre.
Our GO Transit guide explains how to ride GO trains and buses across the region, and our Eglinton Crosstown Line 5 guide covers Toronto’s newest light rail line. Flying out? See how to get to Toronto Pearson Airport by train, TTC or GO.
Toronto GTA News covers Toronto, the GTA, Ontario, Quebec and Canada: local news, real estate, money, health and the trending stories people are talking about.
Comments are off for this post.